This page was exported from PassLeader New Cisco Exam Dumps - CCNA, CCNP, CCIE, DevNet, CCDE Certification Exam Dumps VCE and PDF and Braindumps and Practice Tests [ https://www.ciscovceplus.com ] Export date:Sat Mar 23 1:19:44 2024 / +0000 GMT ___________________________________________________ Title: Valid 300-360 Dumps with VCE and PDF for Free (Question 11 - Question 15) --------------------------------------------------- New 300-360 exam questions from PassLeader 300-360 dumps! Welcome to download the newest PassLeader 300-360 VCE and PDF dumps: http://www.passleader.com/300-360.html (185 Q&As --> 208 Q&As --> 230 Q&As --> 262 Q&As) P.S. Free 300-360 dumps are available on Google Drive shared by PassLeader: https://drive.google.com/open?id=0B-ob6L_QjGLpWVVreDl3bGRhakk QUESTION 11 Which three recommendations must be taken into consideration when an engineer is installing a new Voice WLAN? (Choose three.) A.    Use the Cisco wireless phone site survey client utility. B.    Use a separate Cisco Wireless Lan Controller. C.    Enable load balance on voice WLANs. D.    Maintain -67dBM as a minimal RSSI. E.    Set data for 2.4 GHz and voice for 5 GHz using separate SSIDs. F.    Enable lower data rates for 2.4-GHz data WLAN. Answer: ADE QUESTION 12 A customer wants to implement a wireless network in a historic location, but is concerned about the structural and aesthetic impact to the facility. Which benefit of using wireless mesh addresses these concerns? A.    Power is required only at the installation location. B.    The APs do not have LED lights. C.    More wireless channels can be supported. D.    APs do not need network connections. Answer: D QUESTION 13 Which three things do you need to consider prior to performing a wireless site survey? (Choose three.) A.    The time required to acquire any additional infrastructure components. B.    The time required to survey each potential AP location. C.    The time required to assess application server locations at the customer facility. D.    The type of wireless survey tools required to perform the site survey. E.    The time required to assess customer WLAN density and throughput requirements. F.    The time required to utilize the design mode in Cisco WCS to prepare a preliminary WLAN design to reduce on-site survey time. Answer: BDE QUESTION 14 Which infrastructure issue needs to be verified and potentially resolved before deploying a centralized 802.11n WLAN? A.    That all the access layer switches that the 802.11n APs will connect to support 802.3af power. B.    That all the access layer switches that the 802.11n APs will connect to contain 10/100/1000 Ethernet ports. C.    The location of application and authentication servers. D.    The proposed location for the WDS server. E.    The proposed location for the WCS. Answer: B QUESTION 15 A customer has restricted the AP and antenna combinations for a design to be limited to one model integrated antenna AP for carpeted spaces and one model external antenna AP, with high gain antennas for industrial, maintenance, or storage areas. When moving between a carpeted area to an industrial area, the engineer forgets to change survey devices and surveys several APs. Which option is the best to reduce the negative impact of the design? A.    Deploy the specified access points per area type. B.    Resurvey and adjust the design. C.    Increase the Tx power on incorrectly surveyed access points. D.    Deploy unsurveyed access points to the design. Answer: B New 300-360 exam questions from PassLeader 300-360 dumps! Welcome to download the newest PassLeader 300-360 VCE and PDF dumps: http://www.passleader.com/300-360.html (185 Q&As --> 208 Q&As --> 230 Q&As --> 262 Q&As) P.S. Free 300-360 dumps are available on Google Drive shared by PassLeader: https://drive.google.com/open?id=0B-ob6L_QjGLpWVVreDl3bGRhakk --------------------------------------------------- Images: --------------------------------------------------- --------------------------------------------------- Post date: 2018-02-01 07:54:33 Post date GMT: 2018-02-01 07:54:33 Post modified date: 2019-10-21 07:46:58 Post modified date GMT: 2019-10-21 07:46:58 ____________________________________________________________________________________________ Export of Post and Page as text file has been powered by [ Universal Post Manager ] plugin from www.gconverters.com