This page was exported from PassLeader New Cisco Exam Dumps - CCNA, CCNP, CCIE, DevNet, CCDE Certification Exam Dumps VCE and PDF and Braindumps and Practice Tests [ https://www.ciscovceplus.com ] Export date:Sat Mar 23 0:58:44 2024 / +0000 GMT ___________________________________________________ Title: New 300-360 Dumps with VCE and PDF from PassLeader (Question 6 - Question 10) --------------------------------------------------- New 300-360 exam questions from PassLeader 300-360 dumps! Welcome to download the newest PassLeader 300-360 VCE and PDF dumps: http://www.passleader.com/300-360.html (185 Q&As --> 208 Q&As --> 230 Q&As --> 262 Q&As) P.S. Free 300-360 dumps are available on Google Drive shared by PassLeader: https://drive.google.com/open?id=0B-ob6L_QjGLpWVVreDl3bGRhakk QUESTION 6 Which two types of information must be included in the installation inventory portion of the post-installation report? (Choose two.) A.    all AP, controller, and MSE administrator credentials B.    the names, locations, IP addresses, MAC addresses, etc. for every AP, controller, and MSE in the WLAN C.    a layout of the rack that the equipment is installed D.    results of the coverage audit performed with the site survey mapping tool E.    the number and type of all WLAN clients and tags Answer: AB QUESTION 7 An engineer is configuring an autonomous AP for RADIUS authentication. What three pieces of information must be known to configure the AP? (Choose three.) A.    BVI IP address B.    group name C.    RADIUS IP address D.    PAC encryption key E.    username and password F.    shared secret Answer: ACF QUESTION 8 An engineer is preparing for an outdoor wireless survey to mesh connect a distant remote building to a connected building. Which two types of antennas are appropriate for this application? (Choose two.) A.    circular polarized B.    patch C.    dish D.    Yagi E.    omni Answer: CD QUESTION 9 A cabling contractor is working at a customer facility. The contractor is asking what rating of cable should be installed in return-air areas. Which information can be referenced to provide the contractor the requested information? A.    OSHA Codes B.    BICSI TDDM C.    NEC Ratings D.    IEEE Standards Answer: B QUESTION 10 An engineer plugs in a Cisco Aironet 2700 Series Access Point and it is running in low power. Which three power requirements should be verified? (Choose three.) A.    802.3ac compliant B.    802.3at compliant C.    AP requires 43 VDC to function in full power D.    AIR-PWRINJ3 power injector should be used E.    AP requires 57 VDC to function in full power F.    AIR-PWRINJ4 power injector should be used Answer: BEF Explanation: The access point should be powered by any 802.3at compliant device. The recommended external power supply for the access point is the Cisco AIR-PWR-B power supply. The access point can also be powered by the following optional external power sources: - Access point power injector (AIR-PWRINJ4) - Any 802.3af compliant power injector is supported, but in this case the access point will dynamically shift from 3x4 to 3x3 http://www.cisco.com/c/en/us/td/docs/wireless/access_point/2700/quick/guide/ap2700getstart.html New 300-360 exam questions from PassLeader 300-360 dumps! Welcome to download the newest PassLeader 300-360 VCE and PDF dumps: http://www.passleader.com/300-360.html (185 Q&As --> 208 Q&As --> 230 Q&As --> 262 Q&As) P.S. Free 300-360 dumps are available on Google Drive shared by PassLeader: https://drive.google.com/open?id=0B-ob6L_QjGLpWVVreDl3bGRhakk --------------------------------------------------- Images: --------------------------------------------------- --------------------------------------------------- Post date: 2018-02-01 07:51:18 Post date GMT: 2018-02-01 07:51:18 Post modified date: 2019-10-21 07:46:50 Post modified date GMT: 2019-10-21 07:46:50 ____________________________________________________________________________________________ Export of Post and Page as text file has been powered by [ Universal Post Manager ] plugin from www.gconverters.com