web analytics

CCNP Data Center 300-615 DCIT VCE Dumps

[28-Apr-2024] New 2020 CCNP 300-615 DCIT Dumps with VCE and PDF from PassLeader (Update Questions)

New 2020 CCNP 300-615 DCIT exam questions from PassLeader 300-615 dumps! Welcome to download the newest PassLeader 300-615 VCE and PDF dumps: https://www.passleader.com/300-615.html (241 Q&As)

P.S. Free 2020 CCNP 300-615 DCIT dumps are available on Google Drive shared by PassLeader: https://drive.google.com/open?id=1W-aHbhcJg8v-SaSl5v5VLYukUCMZ8HYn

NEW QUESTION 225
An engineer is troubleshooting an unexpected blade-server reboot. One of the DIMMs is displayed inside Cisco UCS Manager as “degraded with correctable errors” but is still available for the OS to use. Which action resolves the issue?

A.    Reset the Cisco UCS chassis.
B.    Replace the DIMM.
C.    Reset the BMC.
D.    Replace the CPU.

[21-Aug-2022] New 2020 CCNP 300-615 DCIT Dumps with VCE and PDF from PassLeader (Update Questions)

New 2020 CCNP 300-615 DCIT exam questions from PassLeader 300-615 dumps! Welcome to download the newest PassLeader 300-615 VCE and PDF dumps: https://www.passleader.com/300-615.html (190 Q&As –> 241 Q&As)

P.S. Free 2020 CCNP 300-615 DCIT dumps are available on Google Drive shared by PassLeader: https://drive.google.com/open?id=1W-aHbhcJg8v-SaSl5v5VLYukUCMZ8HYn

NEW QUESTION 156
A network engineer must connect a Cisco UCS Fabric Interconnect cluster to the Cisco ACI. VMware ESXi hypervisors have been installed on Cisco UCS blades and a VMware VMM domain has been configured. However, virtual machines fail to reach their default gateway in the Cisco ACI Fabric. The engineer investigates the issue and notices that the VMware Distributed Switch (VDS) teaming policy is set to “Route based on IP hash”. Which action resolves the issue?

A.    Configure the vSwitch Policy on the VMM domain.
B.    Disable the On-demand EPG resolution immediacy setting in ACI.
C.    Disable the VMware Network I/O Control on the VDS.
D.    Configure the vSwitch Policy on a VDS.

[30-Dec-2021] New 2020 CCNP 300-615 DCIT Dumps with VCE and PDF from PassLeader (Update Questions)

New 2020 CCNP 300-615 DCIT exam questions from PassLeader 300-615 dumps! Welcome to download the newest PassLeader 300-615 VCE and PDF dumps: https://www.passleader.com/300-615.html (146 Q&As –> 190 Q&As –> 241 Q&As)

P.S. Free 2020 CCNP 300-615 DCIT dumps are available on Google Drive shared by PassLeader: https://drive.google.com/open?id=1W-aHbhcJg8v-SaSl5v5VLYukUCMZ8HYn

NEW QUESTION 131
An engineer is implementing a new BGP peering in their new data center. The engineer set up the BGP session that peers with the remote end. As soon as the BGP peers attempt to exchange routing prefixes, one of the BGP peers drops the connection. After reviewing the configuration, the engineer reviews the logging messages. The engineer discovers that the router is missing keepalives from the remote end and terminates the session. Which action resolves the issue?

A.    Set the bgp transport path-mtu-discovery attribute on both peers.
B.    Set the higher values for the BGP keepalive and hold-down timers on both peers.
C.    Configure the matching BGP AS numbers between the peers.
D.    Configure the matching BGP passwords between the peers.

(more…)

[20-May-2021] New 2020 CCNP 300-615 DCIT Dumps with VCE and PDF from PassLeader (Update Questions)

New 2020 CCNP 300-615 DCIT exam questions from PassLeader 300-615 dumps! Welcome to download the newest PassLeader 300-615 VCE and PDF dumps: https://www.passleader.com/300-615.html (122 Q&As –> 146 Q&As –> 190 Q&As –> 241 Q&As)

P.S. Free 2020 CCNP 300-615 DCIT dumps are available on Google Drive shared by PassLeader: https://drive.google.com/open?id=1W-aHbhcJg8v-SaSl5v5VLYukUCMZ8HYn

NEW QUESTION 108
A network engineer is implementing the Cisco ACI Fabric and notices that the Leaf-1 switch is registered, has an assigned name, but is displayed as inactive in the APIC. After further investigation, it became clear that the leaf switch was recently moved from another Cisco ACI environment. Which action resolves the problem?

A.    Clean reload the Leaf-1 switch.
B.    Define the new TEP address for Leaf-1.
C.    Change the clock offset from low to high between apic 1 and Leaf-1.
D.    Modify the ISIS interface peering IP address between apic 1 and Leaf-1.

[1-Apr-2020] New 2020 CCNP 300-615 DCIT Dumps with VCE and PDF from PassLeader (Update Questions)

New 2020 CCNP 300-615 DCIT exam questions from PassLeader 300-615 dumps! Welcome to download the newest PassLeader 300-615 VCE and PDF dumps: https://www.passleader.com/300-615.html (106 Q&As –> 122 Q&As –> 146 Q&As –> 190 Q&As –> 241 Q&As)

P.S. Free 2020 CCNP 300-615 DCIT dumps are available on Google Drive shared by PassLeader: https://drive.google.com/open?id=1W-aHbhcJg8v-SaSl5v5VLYukUCMZ8HYn

NEW QUESTION 1
A customer configures HSRP between two data centers that are interconnected with OTV. The configuration succeeds, but traffic between two ESXi virtual hosts on the same site is routed suboptimally through the OTV overlay. Which two actions optimize the traffic? (Choose two.)

A. Disable first-hop redundancy.
B. Filter HSRP traffic by using a Layer 3 VACL on the OTV edge devices.
C. Filter HSRP by using a Layer 2 MAC-list on the ESXi vSwitch.
D. Filter HSRP traffic by using a Layer 3 VACL on the ESXi vSwitch.
E. Filter HSRP by using a Layer 2 MAC-list on the OTV edge devices.

(more…)