web analytics

100% Pass Guarantee PassLeader 300-360 Dumps with VCE and PDF for Free (Question 36 – Question 40)

New 300-360 exam questions from PassLeader 300-360 dumps! Welcome to download the newest PassLeader 300-360 VCE and PDF dumps: http://www.passleader.com/300-360.html (185 Q&As –> 208 Q&As –> 230 Q&As –> 262 Q&As)

P.S. Free 300-360 dumps are available on Google Drive shared by PassLeader: https://drive.google.com/open?id=0B-ob6L_QjGLpWVVreDl3bGRhakk

QUESTION 36
Which two options describe best practices that must be completed after a wireless installation is finished? (Choose two.)

A.    Make sure that there are no spaces between the devices on the rack that the Wireless Lan Controller isinstalled.
B.    Consult with the customer to ensure that the IT staff has a complete set of design and installationdocuments.
C.    Make sure the customer is aware that they should consider purchasing a support contract immediately afterthe installation is complete.
D.    Spend time with the customer to show them the controller GUI and inform them how they can reach theCisco TAC if they have any problems.
E.    Test all the customer’s wireless devices and applications to ensure they are working properly.

Answer: BE

QUESTION 37
A customer is deploying a Greenfield 802.11ac network on a floor that will support approximately 300 wireless devices. Which setting needs to be changed on Prime Infrastructure Planning Tool in order to predict the amount of access points the customer needs to service the new floor?

A.    Data Coverage Support Margin
B.    Demand Settings
C.    Add AP Field
D.    802.11n Protocol Support

Answer: B
Explanation:
http://www.cisco.com/c/en/us/td/docs/wireless/prime_infrastructure/1-2/configuration/guide/pi_12_cg/maps.html#pgfId-1671104

QUESTION 38
What is the recommended minimum speed at the edge of the cells in an 802.11g network for a good Cisco VoWLAN deployment?

A.    11 Mb/s
B.    36 Mb/s
C.    12 Mb/s
D.    18 Mb/s

Answer: C

QUESTION 39
An engineer is conducting a location readiness test and wants a selected point to be considered location-ready. Which three possible configurations reflect the minimum number of APs needed? (Choose three.)

A.    One AP is resident in each quadrant surrounding the point-in-question.
B.    One AP per 1400 sq. ft. on the map.
C.    Two APs are resident in each quadrant surrounding the point-in-question.
D.    Four APs are deployed on the floor.
E.    Three APs are within 70 feet (21 meters) of the point-in-question.
F.    Three APs are deployed on the floor.

Answer: ADE

QUESTION 40
A network engineer is configuring QoS with a DSCP value of 46. To which queue must the CoS be mapped for priority queuing of the voice frames?

A.    1
B.    2
C.    5
D.    4
E.    3

Answer: C


New 300-360 exam questions from PassLeader 300-360 dumps! Welcome to download the newest PassLeader 300-360 VCE and PDF dumps: http://www.passleader.com/300-360.html (185 Q&As –> 208 Q&As –> 230 Q&As –> 262 Q&As)

P.S. Free 300-360 dumps are available on Google Drive shared by PassLeader: https://drive.google.com/open?id=0B-ob6L_QjGLpWVVreDl3bGRhakk